BMD - Leeds
Verdun Interchange Upgrade - Flight 1
The Verdun freeway exit upgrade is one of the more significant pieces of infrastructure currently underway on the South Eastern Freeway — and it's being documented from day one.
JKTP was engaged by BMD Leeds to provide full visual coverage across the life of the project, combining timelapse and drone to capture both the detail and the scale of the build. Three timelapse cameras were installed on 9m poles at the Verdun exit — the tallest timelapse pole install in South Australia — giving continuous, high-resolution coverage of the site from a vantage point no ground-level rig can match. Drone footage runs alongside, providing aerial context at key stages of the build.
The result is a complete visual record of a major infrastructure project — from early civil works through to completion.